Schedule of Condition Reports
Knowledge is key
Whether you are about to let or take a lease of a commercial property, a Schedule of Condition is well worth considering. It creates a clear, agreed record of the property's condition at a specific point in time, helping protect both landlords and tenants.
For tenants, RICS notes that, depending on the lease clauses, a Photographic Schedule of Condition can be used to record condition before signing, potentially limiting repairing liability, and any record of condition needs to be appended to the lease before signing so it forms part of the legal contract.
Walker Wood's specialist team is happy to provide initial advice to landlords and prospective tenants on the most appropriate approach and scope.
Where schedules of condition are used
Schedules of Condition are most commonly used:
-
At lease commencement, to help limit disputes and manage dilapidations exposure by recording pre-existing defects and condition
-
In Party Wall matters, as an evidential record of condition before works start. RICS notes that, while it is not a statutory requirement, it is recommended that surveyors record a schedule of condition of the relevant parts and append it to the award.
What a Schedule of Condition includes
A Schedule of Condition is typically a non-intrusive, visual inspection, supported by photographs and, where instructed, written descriptions of visible condition. It is designed to record the presence and condition of defects at the date of inspection, rather than diagnose causes or specify remedial works.
Two options, depending on the property and risk
Walker Wood Chartered Building Surveyors can provide:
-
Photographic Schedule of Condition, a structured photographic record of condition
-
Photographic and written Schedule of Condition, photographs supported by concise written descriptions, which can make later comparisons easier, particularly on larger or more complex premises
The cost of producing an agreed Schedule of Condition is often modest when compared with the potential cost and disruption of lease-end disagreement or a dilapidations claim.
The Walker Wood approach
We agree the scope, access arrangements, and purpose of the document at the outset, then carry out a thorough site inspection of the accessible areas within scope. For Party Wall instructions, RICS notes the schedule should be compiled before works start and should include the parts of the adjoining owner's building and grounds that may be affected.
Case study
Logistics Warehouse

Reduced dilapidations claim of over 70%, saving £4 million
Following a relocation our client faced a £5.7 million dilapidations claim from their landlord, which Walker Wood Limited was instructed to negotiate.
Read the case studyFrequently asked questions
What is a Schedule of Condition?
A Schedule of Condition is a dated record of a property's condition at a point in time, usually supported by photographs and, where instructed, written descriptions. It is commonly used at lease commencement and in Party Wall matters.
Does it need to be attached to the lease?
Yes, if you want it to limit lease liabilities, it needs to be appended to the lease before signing so it forms part of the contract.
Is a Schedule of Condition the same as a building survey?
No. A Schedule of Condition is typically a non-intrusive record of visible condition and is not intended to be a full structural survey, or a diagnostic defects report with remedial specifications.
Do you prepare schedules for Party Wall Awards?
Yes. RICS notes that while a schedule of condition is not a statutory requirement, it is recommended practice to record one and append it to the award.

